1-800-772-8800Toll Free
CENTER GROVE HIGH SCHOOL NATATORIUM
Greenwood, IN

CENTER GROVE HIGH SCHOOL NATATORIUM

Infill

Wire Mesh, Picket, Glass

Application

Natatoriums & Water Parks

Finish

Powder Coat, Clear Anodized

Project Overview

The Indianapolis based offices of Fanning Howey Architects and specialty railing contractor, Spohn Associates collaborated to accomplish the vision of Center Grove High School’s Natatorium facility addition. The natatorium is home to one of Indiana’s largest competition pools which includes a ten-lane Olympic-sized aquatic center connected to the existing campus. Hollaender’s Structural Glass Railing System with aluminum base shoe and top cap was the perfect combination of railing safety and unmatched sight lines for spectators.

The Indianapolis based offices of Fanning Howey Architects and specialty railing contractor, Spohn Associates collaborated to accomplish the vision of Center Grove High School’s Natatorium facility addition. The natatorium is home to one of Indiana’s largest competition pools which includes a ten-lane Olympic-sized aquatic center connected to the existing campus. Hollaender’s Structural Glass Railing System with aluminum base shoe and top cap was the perfect combination of railing safety and unmatched sight lines for spectators. The design team artfully weaved the school’s sunburst red color throughout the railing system, providing a fantastic environment for competition and spectators.

Project Gallery

10 images
Centergrove HS Natatorium Structural Glass (2)
LocationGreenwood, INSystemStructural GlassInfillClear Laminated GlassMaterialAluminumApplicationNatatoriums & Water ParksFinishPowder Coat
1/10

Downloads

Documents & Resources

Drawings

Technical Specifications

More Work

Similar Projects

View All
First Internet Bank
Featured
Fishers, IN

First Internet Bank

The Indianapolis, Indiana, based offices of Browning Day and specialty railing contractor, Spohn Associates, collaborated to create an amazing architectural designed space for the First Internet Bank in Indianapolis, Indiana. The project required over 3,500 linear feet of railing and incorporated a veritable plethora of Hollaender railing designs.

Details →
PHILADELPHIA NAVAL SHIPYARD
Philadelphia, PA

PHILADELPHIA NAVAL SHIPYARD

This old shipyard, along the banks of the Delaware River, was not accessible by the public due to the 2-line railing that had been there for many years.

Systems Used:

Details →
HAMMELS WYE - NYTA
Rockaway, NY

HAMMELS WYE - NYTA

The New York Metropolitan Transportation Authority (MTA) completed the restoration of the Hammels Wye Viaduct, a critical rail junction on the Rockaway Line, as part of the Rockaway Line Resiliency and Rehabilitation Project.

Systems Used:

Details →