Project Portfolio
All Projects
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.
FeaturedFirst Internet Bank
The Indianapolis, Indiana, based offices of Browning Day and specialty railing contractor, Spohn Associates, collaborated to create an amazing architectural designed space for the First Internet Bank in Indianapolis, Indiana. The project required over 3,500 linear feet of railing and incorporated a veritable plethora of Hollaender railing designs.
Systems Used:

Vega Americas
A structural glass railing system brings modern transparency to the VEGA Americas facility in Mason, Ohio. Satin-polished stainless-steel cladding and a U-channel top cap provide a refined, durable finish that complements the building’s contemporary design.
Systems Used:

Ursuline Academy
Hollaender’s Interna-Rail® system combines a clear-anodized frame with durable, powder-coated diamond wire mesh at Ursuline Academy. ADA-compliant handrails complete an accessible, visually distinctive solution designed for a busy educational environment.
Systems Used:

Times Union Center
Albany Times Union Center was in for a major, $20 million renovation, including a brand new atrium (formerly an open area), new waterfall feature glass elevator, and the railings required to protect the public in this large space.
Systems Used:

Skyzone™ Trampoline Parks
Skyzone™ is the international market leader in trampoline parks, with over 130 parks in the U.S., Canada, Australia, Latin American & Europe. In early 2013, Skyzone corporate decided they needed to standardize on a railing system, for both branding and cost purposes. The practice to that time had been to let franchise partners source locally fabricated railing giving each park a different look. The purchasing power of potentially multiple parks per year would be far greater than that of a single park, and Skyzone wanted a more uniform branding strategy.
Systems Used:

Pronova Solutions
Pronova Solutions constructed a new major office and plant complex in Blount County, TN (Knoxville area) to house their newly developed proton therapy system for cancer treatment.
Systems Used:

Office Building
Hollaender’s VISION™ stainless-steel railing system brings openness and refined modern style to this Cincinnati office building. Glass infill and a #4 directional satin finish create a durable, polished solution for the contemporary workplace.
Systems Used:

North Meridian Street
Structural glass railing brings openness and polished modern style to the North Meridian Street project. Half-inch monolithic glass, stainless-steel cladding, and a 2½-inch top cap create a durable, visually cohesive solution.
Systems Used:

Mountain Modern Motel
Hollaender’s Speed-Rail® system brings rugged, contemporary character to Mountain Modern Motel. Clear-anodized aluminum and powder-coated steel wire mesh create a durable, open railing solution suited to the Jackson Hole property.
Systems Used:

Lawrenceburg High School
Structural glass railing creates a safe, open environment at Lawrenceburg High School. Half-inch monolithic glass, anodized aluminum cladding, and a coordinating top cap deliver a durable, contemporary solution for the educational facility.
Systems Used:

Igo Elementary
Hollaender’s VUE™ stainless-steel railing system creates a safe, open environment at Igo Elementary. Glass infill and a #4 directional finish provide lasting durability with a clean, contemporary appearance.
Systems Used:

Fifth Third Bank
Structural glass railing brings openness and polished contemporary style to Fifth Third Bank. Glass infill and #4 directional satin stainless-steel handrails create a durable, refined solution for the Cincinnati facility.
Systems Used:

CT College Waterfront Improvements
Hollaender’s Interna-Rail® system provides lasting safety and visibility along the Connecticut College waterfront. Clear-anodized aluminum and lock-crimp wire mesh create an open, corrosion-resistant solution for the exposed outdoor environment.
Systems Used:

Center Grove High School
Center Grove High School features a coordinated mix of Hollaender railing systems with glass, picket, and wire mesh infill. Clear-anodized finishes, transparent glass, and bold red mesh provide durable, accessible solutions with distinct architectural character.
Systems Used:

Ball State University - North Dining Hall
Structural glass railing brings openness and contemporary style to Ball State University’s North Dining Hall. Directionally polished 304 stainless steel and a warm wood assist rail create a refined, welcoming solution for the active campus environment.
Systems Used:

5200 Paramount Parkway
Hollaender’s KLEAR™ railing system brings openness and contemporary style to 5200 Paramount Parkway. Clear-anodized aluminum and ⅜-inch tempered glass create a durable, visually unobtrusive solution for the modern commercial space.
Systems Used:

West Liberty University Football Stadium Press Box
West Liberty University decided to install a new press box at their football stadium requiring a new railing system.
Systems Used:

Main + Stone
The Main + Stone Project is a mixed use (multi-family residential and retail) project in a highly visible part of Greenville, South Carolina. Its location and end use made it a high profile signature project for the newly developing downtown.
Systems Used:

Rhinegeist Brewery
Rhinegeist Brewery is one of the new “craft beer” breweries on the Cincinnati scene. In 2013, Rhinegeist came under new ownership and renovations commenced. A rooftop patio was included in the renovations, making use of the excellent view of the Cincinnati skyline. Hollaender designed a custom version of the KLEAR railing system with few obstructions. KLEAR, by concept, uses the top of the glass infill as the top of the 42" high railing, and provides excellent transparency while meeting codes.
Systems Used:

Purdue University - Hagle Hall
When Purdue University required a world-class design for Hagle Hall, the home of Purdue’s Orchestras and All-American Marching Band, they called upon Browning Day Architects of Indianapolis, Indiana. The Stainless Steel Post Mounted VISION™ railing system was the perfect design accent to the facility’s modern aesthetic and open floorplan.
Systems Used:

Oschner Medical Center
HMS Architects of New Orleans was tasked by Oschner Medical Centers to design a new campus for their facility located in Kenner, Louisiana. One of their concerns involved exterior guardrail on a down ramp. Due to corrosion and high maintenance, both Oschner and HMS have had issues with traditional welded and painted steel systems in the past. They have observed that repainting the top rails of painted railing costs from $5 to $10 per linear foot every three to five years.
Systems Used:

Norfolk Premium Outlets
The Norfolk Premium Outlets development is the newest development for Premium Outlets®, owned and operated by Simon Property Group.
Systems Used:

Maple Dale Elementary School
Maple Dale Elementary School, situated in Cincinnati, Ohio, decided to build several new buildings and contracted the architectural work to CR Architecture + Design of Cincinnati. One of the architectural decisions they faced was that of choosing a railing system. Based on both CR’s experience and that of the school, they wanted a less maintenance intensive system than the painted steel system that had been used in the past.
Systems Used:

Mandalay Bay Casino Nightclub
Josh Held, President of Josh Held Design, was invited by the LIGHT Group in Las Vegas to design the new 38,000 square foot nightclub located in Las Vegas. The concept focused on a “warehouse feel with industrial influences.” Nightclubs in Las Vegas are one of the most extreme environments in hospitality design and have to withstand high capacity, traffic and abuse.
Systems Used:

Liberty Center
Liberty Center is a brand new development that opened in late 2015, located on 100 acres just north of Cincinnati, Ohio. It is mixed use, with retail, residential, and commercial tenants.
Systems Used:

Legacy Charter School
Legacy Charter School located in Greenville, South Carolina had railing overlooking their gym that needed to be replaced due to code requirements. Both the school and the architect liked the look of the old “ball style” railings, and searched for a railing that could emulate this style. Hollaender’s Speed-Rail® railing system is often used when older or industrial looks are desired. Speed-Rail® was selected as the best design to meet this application and was ordered for the railing around the gym.
Systems Used:

Jim Pattison Toyota & Lexus
The Jim Pattison Auto Group is one of the largest automotive groups in western Canada. Their most current projects are located in Victoria, British Columbia. In January 2015 the existing smaller and quite dated Toyota and Lexus facilities were replaced with a spectacular 67,300 square foot Toyota facility consisting of four levels and a 7,700 square foot 2-story Lexus facility.
Systems Used:

Italpollina U.S. Headquarters
Italpollina, a world leader in organic fertilizers, biostimulants and beneficial microorganisms, planned a new production facility at its U.S. headquarters.
Systems Used:

Indiana University Memorial Stadium
Indiana University’s Memorial Stadium was due for a redesign of the railing system, which was contracted to RATIO and SmithGroup for design. The design concept was complex, calling for glass railing that was both shoe mounted and post mounted, as well as wire mesh infill panel railing. The original design called for a series of custom post shapes that were unique, but more expensive than the budget could bear.
Systems Used:

Greentown Labs Corporate HQ
The architects of Silverman Trykowski Associates in Boston, Massachusetts were chosen to design the Greentown Labs Corporate Headquarters in Somerville, Massachusetts. Greentown Lab’s new facility is the World’s Largest Cleantech Incubator. The space includes research and development office space, outdoor and indoor presentation spaces, and maker space for prototyping.
Systems Used:

Glendale High School
Joe Vejraska, project architect for GHN Architects and Engineers, worked with the Springfield Public School District in specifying a railing system for the new construction of Glendale High School’s Commons Area. For both aesthetics and maintenance reasons, the owner and architect wanted a railing that was something other than traditional welded painted steel.
Systems Used:

Boiling Springs High School
Spartanburg School District Two chose Jumper, Carter and Sease Architects from West Columbia, South Carolina for their design and Thompson Turner Construction as general contractor for the recently completed construction of the Boiling Springs High School. The architects of Jumper, Carter and Sease specified Hollaender’s Stainless Steel VUE™ Railing system as a basis of design and coupled it with a white-opaque interlayered PVB glass to provide both a modern and airy feel throughout the facility. The railing was manufactured out of stainless steel which enhanced the sleek modern design and also provided an ultra-clean look throughout the school. Design and construction of modern educational campuses provide unique challenges in terms of railing design and economic value in a budget conscience environment.The Stainless Steel VUE™ system provided economic value compared to other manufacturers and will continue to provide safety, durability, stability and accessibility to the the students and staff of Boiling Springs High School years to come.
Systems Used:

Atlanta Braves Mixed-Use
The Battery Atlanta is a lifestyle destination anchored by SunTrust Park, the new home of the Atlanta Braves.
Systems Used:

22nd & Market
Hollaender’s Speed-Rail® system brings durable, industrial-inspired character to 22nd & Market. A clear-anodized aluminum frame and powder-coated perforated steel panels create a strong, visually distinctive solution for the Denver development.
Systems Used:
Dorothy Lane Market
On the building's exterior, the specification of the Interna-Rail® aluminum system with a vertical picket infill provides a clean, streamlined, and exceptionally sturdy barrier. This mechanical piping system utilizes internal set screws to deliver a smooth, continuous handrail profile that easily withstands seasonal weathering while keeping outdoor walkways safe and accessible.
Systems Used:

Duke Realty Headquarters
Duke Realty’s new headquarters in Indianapolis was designed by Ratio Architects with a unique and fresh approach to redefine the look and feel of a corporate workspace. The architects along with the leaders of Duke Realty challenged the typical and traditional workspace designs by creating an office environment modeled for collaboration and teamwork.
Systems Used:

NORWELL MIDDLE SCHOOL
The Interna-Rail® 2-line architectural railing system by Hollaender offers an exceptional structural solution for school district capital improvement projects, combining rugged durability with a clean, contemporary aesthetic.
Systems Used:

WAYNESVILLE HIGH SCHOOL PERFORMING ARTS CENTER
Hollaender supplied the complete railing package for the Waynesville Performing Arts Center, a 460-seat multipurpose auditorium serving both the Wayne Local School District and the surrounding Waynesville, Ohio community. The scope covered every guarding and handrail condition in the building, from the lobby and vomitory to the tiered seating, stairs, ramps, and sloped aisles.
Systems Used:

THIRD EYE BREWING
Third Eye Brewing Company, originally based in Sharonville, Ohio, expanded to Hamilton by renovating a historic former Pepsi bottling plant near downtown.
Systems Used:

TRINE UNIVERSITY - COLLEGE OF HEALTH PROFESSIONALS
The Dr. Earl D. and Melanie N. Brooks College of Health Professions at Trine University’s Ft. Wayne campus, features an elegant railing system designed by Ft. Wayne based Design CollaboraƟve, with supply and installaƟon managed by Spohn Associates of Indianapolis.
Systems Used:


